How to Write a Project Scope for Freelance Proofreading

Define the file, proofreading pass, exclusions, approval contact, and deliverables in a short brief. Includes wording for a replacement draft or second proof.
Follow these steps at your own pace. Check product terms and prices directly with providers before purchasing.
Quick answer
Write a brief that lets both sides answer three questions: Which file will you check? What counts as a finished pass? Who decides what happens to queries? Send it before the work starts so the client can correct assumptions while they are still easy to change.
What to put in a one-page scope
| Item | Example for a program going to print |
|---|---|
| Source | Spring-program-v3.pdf, 16 pages including covers, tables, and captions. |
| Checks | Spelling, punctuation, consistency of names and times, heading hierarchy, and visible layout slips. |
| Reference and decisions | Use the supplied speaker list and house style. The event coordinator resolves conflicting times. |
| Deliverable and rounds | One annotated PDF and a list of unresolved queries. The designer applies the corrections. A second proof can be quoted separately. |
| Schedule and fee | State the fee, the date and time the final source must arrive, and the return time with its time zone. |
Use one example to settle a vague request
“Check the facts” can mean several things. Ask, “Should I compare session times with the schedule you supplied, or contact the speakers to verify them?” Record the answer. For a long file with inconsistent capitalization, agree on the reference and record recurring decisions in a proofreading style sheet.
Wording you can adapt
I’ll check the 16-page v3 program against the speaker list you supplied and return one annotated PDF by Thursday at 2 p.m. Pacific. I’ll flag conflicting session times for Morgan to confirm. The designer will apply corrections. Rewriting bios, verifying details with speakers, and reviewing a new layout can be estimated separately.
Ask the client to confirm the filename, contact, and delivery time. If they send v4 halfway through, ask for a change list and whether v3 should be retired. Identify pages already checked, then confirm the effect on the fee and turnaround before switching. For a fast-moving job, map the deadline against the hours you actually have.