How to Price a Fixed-Fee Logo Design Project

Build a logo quote from the work you will actually do. A worked estimate shows how concepts, revision rounds, and exports affect the fee and schedule.
Follow these steps at your own pace. Check product terms and prices directly with providers before purchasing.
Quick answer
Define the deliverables, estimate the hours for every stage, and multiply by a working rate that covers your time and overhead. Add project-specific costs once. Quote the client a single fee tied to a precise scope and a process for approving extras.
Scope the job before doing the arithmetic
Use a confirmed logo brief to count what you owe the client. For example, a bakery requests two initial directions, development of one chosen logo, two rounds of consolidated feedback, and one final web and print package. A menu layout, bag illustration, or third concept would each create extra work.
| Illustrative estimate | Hours |
|---|---|
| Brief and client call | 1 |
| Research and concept sketches | 3 |
| Develop two directions and prepare the presentation | 4 |
| Two rounds on the selected direction | 3 |
| Export, test, and hand over files | 2 |
| Total | 13 |
Work the estimate both ways
Suppose your own planning rate is $60 per hour and a single proof costs $20. The example fee is 13 × $60 + $20 = $800. Those figures illustrate the calculation. Set your own rate from your business costs, available billable time, and target compensation. If the job takes 16 hours, the same $800 fee leaves ($800 − $20) ÷ 16 = $48.75 per hour before other expenses. That second calculation shows what a missed revision round can cost.
Show the client what the fee buys
Sample wording for this example: “The $800 fee covers two initial logo directions, refinement of one selected direction through two feedback rounds, one print proof, and the final files listed below. Each round starts with one combined list from the owner. I’ll send a separate estimate for a new direction or additional applications before starting that work.” Set delivery dates around when the owner can supply materials and respond.
If the client has a smaller budget
Ask which use they need at launch. You might quote one concept and defer a secondary layout, then recalculate the hours. Keep production checks for the files you still promise. If a new request arrives mid-project, compare it with the written scope and agree on the revision list before adjusting the fee or deadline.
Comments
Comments are reviewed before they become public.
Sign in with Google to leave a comment.
Sign in with GoogleNo approved comments yet. Be the first to start the discussion.